1. Determine the maximum steel ball diameter. The influence of the steel ball diameter of the ball mill on the grinding efficiency cannot be ignored. The experimental data of relevant experts in beneficiation equipment show that if the ball diameter of the ball mill is too large or too small, the grinding efficiency will be significantly reduced, and even the entire grinding process will be seriously endangered.
2. The rationality of measuring the ratio of steel balls with the surface area ratio of steel balls. The surface area ratio of steel balls in a warehouse should reach 9.5-10.5m2 per ton of steel balls. For closed-circuit ball mill with roller press, this value can be adjusted to 12-14m2/t steel balls. The liner used is continuously lifted. The surface area ratio of the steel balls installed in the second warehouse should be 35-38m2/t steel balls, and it can be 38-40m2/t steel balls with a roller press. The specific ratio between the various ball diameters is calculated based on the maximum bulk density.
3. Determine the total amount of steel balls allowed to be installed according to the power of the main motor of the ball mill. The load rate of the steel ball filling space is generally 25%-35%. Steel balls have lower load rates and lower power consumption, but also lower productivity. Therefore, the first premise to verify the total amount of steel balls added is that the sum of the weight of the steel balls and the weight of the material during grinding should be less than the allowable value close to the motor power of the ball mill.
It conforms to the principle of loading original balls in accordance with the main functions of the steel balls in each warehouse, combined with the type of lining used. The clinker particles fed by a warehouse can reach up to 30 mm, and its main function is to crush, so. The diameter of the loaded steel ball should be between 50-90 mm. The clinker entering the second warehouse of the ball mill is less than 2-3 mm, so its function is fine grinding, and the steel ball range of the warehouse should be 15-50 mm. Because fine grinding is primarily inter-grinding, single-sized balls (20-25 mm) can be fitted with a single corrugated liner for maximum efficiency. If the two warehouses still choose steel balls with a certain range of diameters, a graded liner can be used, so that the larger balls are close to the partition, and the smaller balls are located at the discharge end.